Planning a Phinisi Build Programme: From Brief to Trials
A project programme follows the agreed design, timber and equipment availability, construction scope, inspections and trials. The responsible yard and specialists set milestones for that project; there is…
Heritage & Journal
Phinisi Project Journal — Bulukumba Shipyard
Notes from the build and refit desk.
Shipyard Journal
Planning a Phinisi Build Programme: From Brief to Trials
A project programme follows the agreed design, timber and equipment availability, construction scope, inspections and trials. The responsible yard and specialists set milestones for that project; there is…
Bahasa Indonesia
Tahap Pembangunan Kapal Kayu di Galangan Bulukumba, dari Lunas ke Peluncuran
Membangun kapal kayu di galangan Bulukumba mengikuti urutan tahap yang sudah teruji generasi: pemilihan kayu, peletakan lunas, pemasangan kulit lambung lebih dulu (metode plank-first), baru gading, lalu dek,…
Plank-First: Why Sulawesi Shipwrights Build the Hull Before the Frame
In most Western wooden boatbuilding, the frames go up first and the planking follows. In South Sulawesi it is the other way round: the hull skin is raised…
Choosing Timber for a Phinisi: Bitti, Ironwood and Teak Explained
A wooden hull is only as honest as the wood inside it. The three timbers that build a phinisi each do a specific job: bitti for planking and…
Planning a Phinisi Build Budget: Scope and Estimate Inputs
Cost depends on the agreed drawings, materials, systems, finish, inspection scope and yard proposal. Request a project-specific written estimate with currency, inclusions, exclusions and contingency assumptions; this page…
Bahasa Indonesia
Rincian Biaya Membangun Kapal Phinisi per Komponen di Galangan
Dari sisi galangan, harga sebuah phinisi tersusun dari komponen nyata: kayu, upah tukang, pengencang dan fit-out, mesin dan sistem, rig, serta interior. Artikel ini merinci tiap komponen agar…
Buying a Phinisi Direct from the Yard vs Through a Broker
There are two honest ways to buy a phinisi. Yard-direct means commissioning a new hull built to your specification. Through a broker means buying an existing boat on…
When to Haul Out a Wooden Liveaboard: A Maintenance Calendar
A wooden liveaboard does best on a planned haul-out rhythm, not emergency dockings. The right interval depends on antifouling, water and use, but the principle is simple: get…
Refitting an Ageing Phinisi: A Yard’s Condition-First Approach
Refitting an ageing phinisi starts with one rule: condition first. Before any figure is written, the boat comes out of the water and is assessed — because a…
Dry Docking a Phinisi in Sulawesi: Slipway, Timeline and Cost Factors
Dry-docking a phinisi in Sulawesi means a slipway haul-out: the hull is eased up the ways on a cradle, blocked level, and worked on out of the water.…
Bahasa Indonesia
Merawat Lambung Kayu Kapal Phinisi: Panduan Dok dan Perawatan Berkala
Lambung kayu phinisi bertahan puluhan tahun bila dirawat dengan ritme dok yang terencana — bukan dok darurat. Kuncinya sederhana: naikkan kapal ke slipway, keringkan, periksa, dan dempul ulang…
Building a Dive Liveaboard: Deck, Compressor and Cabin Decisions
A dive liveaboard is built from the dive deck outward. Get the deck, the compressor and the cabins right and the boat runs itself all season; get them…